Key takeaways
- Timing only the 180 initial AI-assisted minutes omits 140 minutes of checking, corrections and handoff.
- The fictional routes differ by 10 minutes per accepted review, with 10 contracts measured in each group.
- At 80 comparable reviews, subtracting four monthly hours of upkeep leaves nine hours and twenty minutes of capacity.
What does a completed review cost in active minutes?
Fictional Relay Parts times twenty similar supplier reviews. Ten use its established manual route and ten use an AI-assisted route. The review team balances document size and difficulty across groups. In the manual group, staff spend 420 active minutes to produce ten accepted reviews. The assisted group spends 180 reading AI results, 90 checking and correcting findings, and 50 on final documentation and handoff. Both groups work to the same acceptance checklist.
Relay initially reports that assisted reviews took eighteen minutes apiece, using just the first activity in the second group. The complete assisted workload is 320 minutes, or 32 per contract, compared with 42 manually. The observed difference is ten minutes for each accepted review. These fictional timings demonstrate the arithmetic. They do not establish a performance expectation for another team or any named product.
Separate work time from queue time
Keep two clocks. For turnaround, measure wall time from receipt to acceptance. For labor, add the active minutes each participant spends reading, correcting or handing off the file. A ten-minute call attended by counsel and Finance uses twenty person-minutes. An overnight wait can change turnaround without adding eight hours to the labor ledger. Label the unit next to every number you give the sponsor.
From a pilot timing to a monthly forecast
| Time entry | Observation | Decision or next action |
|---|---|---|
| Manual baseline | 420 active minutes for ten accepted reviews. | 42 minutes per accepted review. |
| Assisted baseline | 180 initial minutes, 90 correction minutes, 50 handoff minutes. | 32 minutes per accepted review. |
| Projected monthly capacity | 80 comparable reviews × 10 minutes saved, less 240 minutes of monthly upkeep. | Illustrative net 9 hours 20 minutes per month. |
Use the same acceptance checklist
Randomly assign comparable contracts where practical, balance experience levels, and give both routes the same source documents. Avoid having the same person immediately reread an identical contract because they may remember the answer. Ask another reviewer to judge accepted outputs against a short answer key without seeing which route produced them. Log a reopened review against its original route if a material omission needs repair.
Calculate usable monthly capacity
At 80 comparable reviews a month, 10 minutes per review yields 800 minutes, or 13 hours 20 minutes. Relay expects four hours of monthly playbook maintenance and quality sampling. That leaves 560 minutes, or 9 hours 20 minutes of estimated capacity. Put initial implementation and training on a separate line. Finance can then ask what work will fill those hours and whether any external spending will actually change.
Measure the full reviewer task
Pick one business question and follow it from opening the draft through checking the source and recording a decision. Keep the stopwatch running during corrections and handoff. Capture the reviewed version so a second person can check what was accepted.
When evaluating contract management software, measure the minutes a second person spends verifying the clause as well. Ask the AI software provider to show the same task without any advance cleanup.
Once Finance has the net hours, use transparent CLM pricing to compare the subscription cost with the value of that capacity. Track rollout costs separately.
For background, see NIST AI Risk Management Framework Playbook · Measure.
For the full workflow, read how to measure contract-team adoption and rework.
View full-size screenshotAI contract review time and correction ledger
Record active minutes through accepted handoff. Separate waiting and one-time setup, reconcile correction work, and subtract recurring upkeep from forecasts.
Preview a completed worksheet row
- Stage or calculation
- Manual baseline
- Sample size / units
- 10
- Initial minutes
- 350
- Correction minutes
- 40
- Handoff / upkeep minutes
- 30
- Result
- 420 total; 42 minutes per accepted review
- Decision use
- Illustrative breakdown of the manual total; use identical acceptance criteria.
Frequently asked questions
What should we do with exceptionally difficult contracts?
Keep them visible. Record a summary by difficulty and identify whether a difficult case is representative of recurring work. Dropping inconvenient examples can turn a useful pilot into an optimistic estimate.
Is this the same as cost savings?
Released reviewer time has value, but actual budget savings depend on what changes in staffing, external spend or throughput. Finance can report capacity separately while the team establishes those effects.
Should we include the hours spent building the playbook?
Track initial work as a separate investment and recurring maintenance against expected monthly capacity. This lets the sponsor evaluate both the early cost of adoption and the steady-state work required.
Can we apply these results to every contract?
Start with the volume of the same kind of work actually tested. If complex data-processing addenda or non-English agreements enter the queue, measure them separately before extending the estimate.